Detailed Explanation of The Production Process of PVC Downpipe Production Equipment

Product Details
Customization: Available
Warranty: Door Installation, Commissioning, Free Training
Product Type: PVC Pipe
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (26)
  • Detailed Explanation of The Production Process of PVC Downpipe Production Equipment
  • Detailed Explanation of The Production Process of PVC Downpipe Production Equipment
  • Detailed Explanation of The Production Process of PVC Downpipe Production Equipment
  • Detailed Explanation of The Production Process of PVC Downpipe Production Equipment
  • Detailed Explanation of The Production Process of PVC Downpipe Production Equipment
  • Detailed Explanation of The Production Process of PVC Downpipe Production Equipment
Find Similar Products

Basic Info.

Model NO.
65/132
Screw No.
Double-screw
Automation
Non-Automatic
Computerized
Non-Computerized
Certification
CE
Customized
Non-Customized
Condition
New
After-sales Service
Door Installation, Commissioning, Free Training
Extrusion Capacity
180-200kg/H
Screw Number
Twin Screw
Barrel Heating Power
37kw
Transport Package
Container
Specification
75-200(mm)
Trademark
zhongrui
Origin
Qingdao, China
Production Capacity
100 Sets

Product Description

Detailed explanation of PVC downspout production equipment (production process):

(1) Mixing of raw materials: adding PVC stabilizers, plasticizers, antioxidants and other auxiliary materials into the high-speed mixer according to the proportion and process. The materials are heated to the set process temperature through self-friction between the materials and the machine. The material is reduced to 40-50 degrees by the cold mixer; in this way, it can be added to the hopper of the extruder.
(2) Extruder part: This machine is equipped with a quantitative feeding device to match the extrusion volume with the feeding volume and ensure stable extrusion of the product. Due to the characteristics of the conical screw, the feeding section has a larger diameter, and the heat transfer area and shear speed of the material are relatively large, which is conducive to the plasticization of the material. The small diameter of the screw in the metering section reduces the heat transfer area and the melt. The shear speed enables the melt to be extruded at a lower temperature. When the screw rotates in the barrel, it plasticizes the PVC mixture and pushes it to the machine head, so as to achieve compaction, melting, mixing and homogenization; and to achieve the purpose of exhaust and dehydration. The feeding device and screw drive device adopt frequency conversion speed regulation, which can realize synchronous speed regulation.
(3) Extrusion die head part: the PVC that has been compacted, melted, mixed and homogenized, and the subsequent materials are pushed to the die head by the screw. The extrusion die head is a key part of pipe forming.
(4) The vacuum shaped water tank is used for the shaping and cooling of the pipes. The vacuum shaped water tank is equipped with a vacuum system and a water circulation system for shaping and cooling. The stainless steel box body, circulating water spray cooling, and the vacuum shaped water tank are equipped with forward and backward moving devices and Manual device for adjusting left and right and height.
(5) The traction machine is used to continuously and automatically lead the cooled and hardened pipe from the machine head, with frequency conversion and speed regulation.
(6) Cutting machine: After being controlled by the travel switch according to the required length, it will automatically cut, and delay the overturning, and implement flow production. The cutting machine uses the fixed-length switch signal as a command to complete the entire cutting process. The pipe operation is kept synchronized, and the cutting process is completed by electric and pneumatic drive. The cutting machine is equipped with a dust suction device to suck out the cutting debris in time and recover it.
(7) The turning action of the turning frame is realized by the air cylinder through the air circuit control. The turning frame is equipped with a limit device. When the cutting saw cuts the pipe, the pipe continues to be transported. After a delay, the cylinder enters the work to realize the turning Material movement, to achieve the purpose of unloading. After unloading, it will automatically reset after a few seconds delay, and wait for the next cycle. 


technical parameter:

 
model 65/132
Extruding capacity 180-200kg/h
Specifications 75-200(mm)
thickness 0.8-4mm
Motor power 37kw
Screw diameter 65mm
 
Detailed Explanation of The Production Process of PVC Downpipe Production EquipmentDetailed Explanation of The Production Process of PVC Downpipe Production EquipmentDetailed Explanation of The Production Process of PVC Downpipe Production EquipmentDetailed Explanation of The Production Process of PVC Downpipe Production EquipmentDetailed Explanation of The Production Process of PVC Downpipe Production Equipment
Detailed Explanation of The Production Process of PVC Downpipe Production EquipmentDetailed Explanation of The Production Process of PVC Downpipe Production EquipmentDetailed Explanation of The Production Process of PVC Downpipe Production EquipmentDetailed Explanation of The Production Process of PVC Downpipe Production EquipmentDetailed Explanation of The Production Process of PVC Downpipe Production Equipment
common problem :

1. Why choose
We We are Qingdao Zhongrui Plastic Machinery Co., Ltd. Machine quality and customer satisfaction are our pursuits. I believe we have the strength to provide you with high-quality machines and perfect services.
2. What services do we provide?
Pre-sale communication → design plan, signature confirmation →
Customized production → test machine before shipment → packaging

Shipment → Engineer Installation → Operator Training → Technical Support
3. Payment terms:
30% should be paid by T/T as down payment, the balance (70% of the total) should be paid by T/T or irrevocable L/C by payment (at sight) before delivery.
4. Delivery conditions:
4.1 D delivery conditions: FOB Qingdao port or CIF port of destination.
4.2 Delivery period: 30- _ _ _60 working days after receiving the advance payment, the seller should notify the buyer to inspect the goods, and the seller should complete the packaging of the goods and prepare for delivery within 15 working days after receiving the full payment.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier