Process flow of PVC pipe production line:
Production process: raw material + auxiliary agent preparation → mixing → conveying and feeding → forced feeding → conical twin-screw extruder → extrusion die → sizing sleeve → spray vacuum setting box → soaking cooling water tank → ink printing machine → crawler traction Machine → knife-lifting cutting machine → pipe stacking rack → finished product inspection and packaging.
The equipment of pvc threading pipe production line is composed of SJ90/65 conical double rod extruder with double pipe die head, double pipe vacuum sizing water tank, double pipe tractor, double pipe fixed-length cutting machine, double discharge frame, and uses powder Direct production of raw materials without granulation, saving labor and electricity, and high production efficiency. It can produce 16mm-40mm U-pvc construction electrical casing pipes, construction water supply pipes, etc., with the following characteristics:
1. One mold with two tubes, the production efficiency is more than doubled
2. Independent control, practical and convenient operation
3. The screw has strong plasticization and the pipe has good cold bendability
4. Automatic fixed length cutting, frequency conversion stepless speed regulation
TRADE TERMS
♦Delivery time: |
40 working days from down payment receipt
|
♦ Packing: |
Sea-worthy package mainly with wood pallets, film and some parts in wooden case.
|
♦ Payment: |
30% as advance payment by T/T after signing contract; 70% as balance after inspection machine before delivery by T/T
|
♦ Warranty: |
12 month
|
♦ Validity: |
30 days
|