• PVC Drainage Pipe Production Line/PVC Downspout Machinery Manufacturer
  • PVC Drainage Pipe Production Line/PVC Downspout Machinery Manufacturer
  • PVC Drainage Pipe Production Line/PVC Downspout Machinery Manufacturer
  • PVC Drainage Pipe Production Line/PVC Downspout Machinery Manufacturer
  • PVC Drainage Pipe Production Line/PVC Downspout Machinery Manufacturer
  • PVC Drainage Pipe Production Line/PVC Downspout Machinery Manufacturer

PVC Drainage Pipe Production Line/PVC Downspout Machinery Manufacturer

Warranty: Door Installation, Commissioning, Free Training
Product Type: PVC Pipe
Screw No.: Double-screw
Automation: Non-Automatic
Computerized: Non-Computerized
Certification: CE
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (26)

Basic Info.

Model NO.
65/132
Customized
Non-Customized
Condition
New
After-sales Service
Door Installation, Commissioning, Free Training
Extrusion Capacity
180-200kg/H
Screw Number
Twin Screw
Barrel Heating Power
37kw
Transport Package
Container
Specification
75-200(mm)
Trademark
zhongrui
Origin
Qingdao, China
Production Capacity
100 Sets

Product Description

Equipment for manufacturing pvc pipes pvc water pipe production equipment pvc threaded pipe production equipment

The PVC pipe production line is mainly used to produce PVC pipes. The pipes produced are widely used in agricultural water supply and drainage, building water supply and drainage, cable laying, etc., and plastic PVC pipes of various pipe diameters and wall thicknesses. Because of its characteristics, CPVC plastic pipes are widely used in oilfield crude oil gathering and transportation, chemical temperature and corrosion resistance pipelines, hot water and warm water supply and drainage pipelines, direct buried high pressure and ultra high pressure power transmission, cable protection pipes and other fields.

     The PVC pipe equipment is composed of a conical (parallel) twin-screw extruder, a vacuum setting table, a tractor, a cutting machine, and a turning frame. Conical (parallel) twin-screw extruder and tractor adopt AC frequency conversion speed regulation or British Continental DC speed regulation. Both the vacuum pump and the traction motor adopt high-quality products. According to the diameter and wall thickness of the pipe, the tractor adopts upper and lower crawlers, three claws, four claws, six claws and other traction methods. The cutting machine can choose saw blade cutting or planetary cutting, and it is also equipped with a length counting device. The unit has reliable performance and high production efficiency.


 
TRADE TERMS
 
Delivery time: 40 working days from down payment receipt
 
♦ Packing: Sea-worthy package mainly with wood pallets, film and some parts in wooden case. 
 
♦ Payment: 30% as advance payment by T/T after signing contract;
70% as balance after inspection machine before delivery by T/T 
 
♦ Warranty: 12 month
 
♦ Validity:      30 days
 

PVC Drainage Pipe Production Line/PVC Downspout Machinery ManufacturerPVC Drainage Pipe Production Line/PVC Downspout Machinery ManufacturerPVC Drainage Pipe Production Line/PVC Downspout Machinery ManufacturerPVC Drainage Pipe Production Line/PVC Downspout Machinery Manufacturer

PVC Drainage Pipe Production Line/PVC Downspout Machinery ManufacturerPVC Drainage Pipe Production Line/PVC Downspout Machinery ManufacturerPVC Drainage Pipe Production Line/PVC Downspout Machinery ManufacturerPVC Drainage Pipe Production Line/PVC Downspout Machinery ManufacturerPVC Drainage Pipe Production Line/PVC Downspout Machinery Manufacturer
common problem :

1. Why choose
We We are Qingdao Zhongrui Plastic Machinery Co., Ltd. Machine quality and customer satisfaction are our pursuits. I believe we have the strength to provide you with high-quality machines and perfect services.
2. What services do we provide?
Pre-sale communication → design plan, signature confirmation →
Customized production → test machine before shipment → packaging

Shipment → Engineer Installation → Operator Training → Technical Support
3. Payment terms:
30% should be paid by T/T as down payment, the balance (70% of the total) should be paid by T/T or irrevocable L/C by payment (at sight) before delivery.
4. Delivery conditions:
4.1 D delivery conditions: FOB Qingdao port or CIF port of destination.
4.2 Delivery period: 30- _ _ _60 working days after receiving the advance payment, the seller should notify the buyer to inspect the goods, and the seller should complete the packaging of the goods and prepare for delivery within 15 working days after receiving the full payment.







 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Product Groups

Diamond Member Since 2020

Suppliers with verified business licenses

Plant Area
>2000 square meters
Management System Certification
ISO 9001
OEM/ODM Availability
Yes