• PVC Downpipe Production Line Manufacturers Spot Direct Sales
  • PVC Downpipe Production Line Manufacturers Spot Direct Sales
  • PVC Downpipe Production Line Manufacturers Spot Direct Sales
  • PVC Downpipe Production Line Manufacturers Spot Direct Sales
  • PVC Downpipe Production Line Manufacturers Spot Direct Sales
  • PVC Downpipe Production Line Manufacturers Spot Direct Sales

PVC Downpipe Production Line Manufacturers Spot Direct Sales

Product Type: PVC Pipe
Screw No.: Double-screw
Automation: Non-Automatic
Computerized: Non-Computerized
Customized: Non-Customized
Condition: New
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (26)

Basic Info.

Model NO.
65/132
Motor Power
37kw
Screw Diameter
65mm
Specifications
75-200(mm)
Trademark
zhongrui
Origin
Qingdoajiaozhou
Production Capacity
16set of

Product Description

Advantages:

Beautiful, convenient, elegant color, high production efficiency, automatic equipment

Detailed explanation of PVC downpipe production equipment (production process)


(1) Raw material mixing: PVC stabilizer, plasticizer, antioxidant and other auxiliary materials are added into the high-speed mixer according to proportion and process. The materials are heated to the set process temperature by self friction between materials and machinery, and then the materials are reduced to 40-50 ºC by cold mixer. In this way, they can be added into the hopper of extruder.

(2) Extruder part: This machine is equipped with a quantitative feeding device, so that the extrusion amount and feeding amount can match to ensure the stable extrusion of products. Because of the characteristics of the conical screw, the feeding section has a larger diameter, and the heat transfer area and shear speed of the material are larger, which is conducive to the plasticization of the material. The diameter of the screw in the metering section is smaller, which reduces the heat transfer area and shear speed of the melt, so that the melt can be extruded at a lower temperature. When the screw rotates in the barrel, the PVC mixture is plasticized and pushed to the head, so as to achieve compaction, melting, mixing homogenization, and realize the purpose of exhaust and dehydration. The feeding device and screw drive device adopt frequency conversion speed regulation, which can realize synchronous speed regulation.

(3) PVC, PVC pipes are molded by screw, extrusion head and extrusion head.

(4) The vacuum setting water tank is used for pipe shaping and cooling. The vacuum setting water tank is equipped with vacuum system and water circulation system for shaping and cooling. The stainless steel box is equipped with circulating water spray cooling. The vacuum setting water tank is equipped with front and back moving device and left and right, high and low adjustment manual device.

(5) The tractor is used to continuously and automatically lead the cooled and hardened pipes out of the machine head, with frequency control.


technical parameter:

 
mmmmmmmm 65/132
Extruding capacity 180-200kg/h
Specifications 75-200(mm)
thickness 0.8-4mm
Motor power 37kw
Screw diameter 65mm

PVC Downpipe Production Line Manufacturers Spot Direct SalesPVC Downpipe Production Line Manufacturers Spot Direct SalesPVC Downpipe Production Line Manufacturers Spot Direct Sales




PVC Downpipe Production Line Manufacturers Spot Direct SalesPVC Downpipe Production Line Manufacturers Spot Direct SalesPVC Downpipe Production Line Manufacturers Spot Direct SalesPVC Downpipe Production Line Manufacturers Spot Direct SalesPVC Downpipe Production Line Manufacturers Spot Direct Sales
common problem :

1. Why choose
We We are Qingdao Zhongrui Plastic Machinery Co., Ltd. Machine quality and customer satisfaction are our pursuits. I believe we have the strength to provide you with high-quality machines and perfect services.
2. What services do we provide?
Pre-sale communication → design plan, signature confirmation →
Customized production → test machine before shipment → packaging

Shipment → Engineer Installation → Operator Training → Technical Support
3. Payment terms:
30% should be paid by T/T as down payment, the balance (70% of the total) should be paid by T/T or irrevocable L/C by payment (at sight) before delivery.
4. Delivery conditions:
4.1 D delivery conditions: FOB Qingdao port or CIF port of destination.
4.2 Delivery period: 30- _ _ _60 working days after receiving the advance payment, the seller should notify the buyer to inspect the goods, and the seller should complete the packaging of the goods and prepare for delivery within 15 working days after receiving the full payment.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now