Main technical parameters
Model |
JW130/38-2200 |
JW120/38-1400 |
Material |
PMMA,GPPS |
PMMA,GPPS |
Products Width |
2200mm |
1400mm |
Products Thickness |
1.5-10mm |
1.5-10mm |
Extruder Specification |
Φ130/38;Φ45/30 |
Φ120/38 |
Capacity(Max.) |
550kg/h |
450kg/h |
Equipment features:
1 screw adopts special mixing function and high plasticizing capacity design.
2 the hanger type mold adopts the hanger type design to make the thickness adjustment of the plate more accurate.
3 vertical three roll calender is adopted, which can automatically adjust the thickness of plate, realize high automatic control and reduce energy consumption.
4 mold temperature machine accurately adjusts the drum temperature, with an error of ± 0.5 ºC
5 fixed length cutting, high cutting accuracy
6 Siemens motor, ABB frequency converter, contactor, Siemens PLC control, Siemens LCD display, high-quality electrical components ensure the stability and continuity of production.
---FAQ---Q1.How to pay to you?
A:1)30% of total amount paid by TT as advance, then the seller start production
2)after the machine is finished ,buyer come to test the machine in seller's factory ,
and then pay the 70% balance by TT or irrevocable L/C at sight . Then seller ship the machine.
Q2.How long is the delivery time?
A: For standard machines, it would be 30 days; For non-standard machines and customized machines according
to client s specific requirements, it would be 45 days.
Q3.Do you arrange shipment for the machines?
A:Yes,for FOB or CIF price, we will arrange shipment for you.
Q4.How about the documents after shipment?
After shipment, we ll send all original documents to you by DHL, including Packing List,
Commercial Invoice, B/L, and other certificates as required by clients.
Q5.What's your after-sales service ?
(1)The supplier provides service manual and maintenance instruction of main electric appliances, limb, usage manual of equipment. We also supply water, electricity, gas of equipment and installation drawing. (2)The supplier is responsible for installation, debugging and training, but the air tickets, insurance, eating, housing and every day 100 USD for each engineer will be born by the buyers. We will realize guarantee of repair; replacement and refund of substandard products within one year after the machine leaves factory. And half a year for electric parts. Fittings of the machine will be supplied at preferential price after one year.