PVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe Equipment

Product Details
Customization: Available
Warranty: Door Installation, Commissioning, Free Training
Product Type: PVC Pipe
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (26)
  • PVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe Equipment
  • PVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe Equipment
  • PVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe Equipment
  • PVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe Equipment
  • PVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe Equipment
  • PVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe Equipment
Find Similar Products

Basic Info.

Model NO.
65/132
Screw No.
Double-screw
Automation
Non-Automatic
Computerized
Non-Computerized
Certification
CE
Customized
Non-Customized
Condition
New
After-sales Service
Door Installation, Commissioning, Free Training
Extrusion Capacity
180-200kg/H
Screw Number
Twin Screw
Barrel Heating Power
37kw
Transport Package
Container
Specification
75-200(mm)
Trademark
zhongrui
Origin
Qingdao, China
Production Capacity
100 Sets

Product Description


Process flow of PVC pipe production line

Production process: raw material + auxiliary agent preparation → mixing → conveying and feeding → forced feeding → conical twin-screw extruder → extrusion die → sizing sleeve → spray vacuum setting box → soaking cooling water tank → ink printing machine → crawler traction Machine → Knife Lifting Cutting Machine → Pipe Stacking Rack → Finished Product Inspection and Packaging

Production line function

(1) Mixing of raw materials

(2) Extruder part

(3) Extrusion die head part

(4) The vacuum shaped water tank is used for the shaping and cooling of pipes. The vacuum shaped water tank is equipped with a vacuum system and a water circulation system for shaping and cooling. The stainless steel box body, circulating water spray cooling, and the vacuum shaped water tank are equipped with forward and backward moving devices and Manual device for adjusting left and right and height.



 
TRADE TERMS
Delivery time: 40 working days from down payment receipt
 
♦ Packing: Sea-worthy package mainly with wood pallets, film and some parts in wooden case. 
 
♦ Payment: 30% as advance payment by T/T after signing contract;
70% as balance after inspection machine before delivery by T/T 
 
♦ Warranty: 12 month
 
♦ Validity:      30 days
 


PVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe EquipmentPVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe EquipmentPVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe EquipmentPVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe EquipmentPVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe Equipment
PVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe EquipmentPVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe EquipmentPVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe EquipmentPVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe EquipmentPVC Downspout Equipment/PVC Downspout Extrusion Equipment/Pipe Equipment
common problem :

1. Why choose
We We are Qingdao Zhongrui Plastic Machinery Co., Ltd. Machine quality and customer satisfaction are our pursuits. I believe we have the strength to provide you with high-quality machines and perfect services.
2. What services do we provide?
Pre-sale communication → design plan, signature confirmation →
Customized production → test machine before shipment → packaging

Shipment → Engineer Installation → Operator Training → Technical Support
3. Payment terms:
30% should be paid by T/T as down payment, the balance (70% of the total) should be paid by T/T or irrevocable L/C by payment (at sight) before delivery.
4. Delivery conditions:
4.1 D delivery conditions: FOB Qingdao port or CIF port of destination.
4.2 Delivery period: 30- _ _ _60 working days after receiving the advance payment, the seller should notify the buyer to inspect the goods, and the seller should complete the packaging of the goods and prepare for delivery within 15 working days after receiving the full payment.





 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier