• PVC Downspout Production Equipment PVC Drainage Pipe Production Line
  • PVC Downspout Production Equipment PVC Drainage Pipe Production Line
  • PVC Downspout Production Equipment PVC Drainage Pipe Production Line
  • PVC Downspout Production Equipment PVC Drainage Pipe Production Line
  • PVC Downspout Production Equipment PVC Drainage Pipe Production Line
  • PVC Downspout Production Equipment PVC Drainage Pipe Production Line

PVC Downspout Production Equipment PVC Drainage Pipe Production Line

Warranty: Door Installation, Commissioning, Free Training
Product Type: PVC Pipe
Screw No.: Double-screw
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
PVC Downspout Production Equipment PVC Drainage Pipe Production Line pictures & photos
PVC Downspout Production Equipment PVC Drainage Pipe Production Line
US $64,999-65,999 / Set
Min. Order: 1 Set
Diamond Member Since 2020

Suppliers with verified business licenses

Secured Trading Service
Shandong, China
to see all verified strength labels (26)

Basic Info.

Model NO.
65/132
Automation
Non-Automatic
Computerized
Non-Computerized
Certification
CE
Customized
Non-Customized
Condition
New
After-sales Service
Door Installation, Commissioning, Free Training
Extrusion Capacity
180-200kg/H
Screw Number
Twin Screw
Barrel Heating Power
37kw
Main Motor Speed
1480kw
Transport Package
Container
Specification
75-200(mm)
Trademark
zhongrui
Origin
Qingdao, China
Production Capacity
100 Sets

Packaging & Delivery

Package Size
1800.00cm * 150.00cm * 250.00cm
Package Gross Weight
5000.000kg

Product Description


Process flow of PVC pipe production line

Production process: raw material + auxiliary agent preparation → mixing → conveying and feeding → forced feeding → conical twin-screw extruder → extrusion die → sizing sleeve → spray vacuum setting box → soaking cooling water tank → ink printing machine → crawler traction Machine → Knife Lifting Cutting Machine → Pipe Stacking Rack → Finished Product Inspection and Packaging

Production line function

(1) Mixing of raw materials

(2) Extruder part

(3) Extrusion die head part

(4) The vacuum shaped water tank is used for the shaping and cooling of pipes. The vacuum shaped water tank is equipped with a vacuum system and a water circulation system for shaping and cooling. The stainless steel box body, circulating water spray cooling, and the vacuum shaped water tank are equipped with forward and backward moving devices and Manual device for adjusting left and right and height.

(5) The traction machine is used to continuously and automatically lead the cooled and hardened pipe from the machine head, with frequency conversion and speed regulation.

(6) Cutting machine: After being controlled by the travel switch according to the required length, it will automatically cut and delay the overturning. The cutting machine takes the fixed-length switch signal as a command to complete the whole cutting process, and keeps synchronized with the pipe operation during the cutting process. , The cutting process is completed by electric and pneumatic drive. The cutting machine is equipped with a dust suction device to suck out the cutting debris in time and recover it.

(7) The turning action of the turning frame is realized by the air cylinder through the gas circuit control. The turning frame is equipped with a limit device. When the cutting saw cuts the pipe, the pipe continues to be transported. After a delay, the cylinder enters the work to realize the turning Material movement, to achieve the purpose of unloading. After unloading, it will automatically reset after a few seconds delay, and wait for the next cycle.


 

Mode

 

Pipe range

(mm)

extruders

 

Max. output

(kg/h)

Max. speed 

(m/min)

Total power

(kw)

Line length

(m)

PVC-50x2

16-50

SJSZ51/105

150

6m

60w

20m

PVC-63

16-63

SJSZ45/90

120

10m

45w

20m

PVC-110

50-110

SJSZ51/105

150

6m

60w

24m

PVC-160

63-160

SJSZ65/132

300

5m

100w

24m

PVC-250

110-250

SJSZ80/156

400

3.5m

120w

28m

PVC-315

160-315

SJSZ 80/156

400

3m

160w

28m

PVC-450

250-450

SJSZ 92/188

700

1.5m

200w

36m

PVC-630

315-630

SJSZ92/188

700

0.9

230kw

36m 


TRADE TERMS
Delivery time: 40 working days from down payment receipt
 
♦ Packing: Sea-worthy package mainly with wood pallets, film and some parts in wooden case. 
 
♦ Payment: 30% as advance payment by T/T after signing contract;
70% as balance after inspection machine before delivery by T/T 
 
♦ Warranty: 12 month
 
♦ Validity:      30 days
 


PVC Downspout Production Equipment PVC Drainage Pipe Production LinePVC Downspout Production Equipment PVC Drainage Pipe Production LinePVC Downspout Production Equipment PVC Drainage Pipe Production LinePVC Downspout Production Equipment PVC Drainage Pipe Production Line
PVC Downspout Production Equipment PVC Drainage Pipe Production LinePVC Downspout Production Equipment PVC Drainage Pipe Production LinePVC Downspout Production Equipment PVC Drainage Pipe Production LinePVC Downspout Production Equipment PVC Drainage Pipe Production LinePVC Downspout Production Equipment PVC Drainage Pipe Production Line

common problem :

1. Why choose
We We are Qingdao Zhongrui Plastic Machinery Co., Ltd. Machine quality and customer satisfaction are our pursuits. I believe we have the strength to provide you with high-quality machines and perfect services.
2. What services do we provide?
Pre-sale communication → design plan, signature confirmation →
Customized production → test machine before shipment → packaging

Shipment → Engineer Installation → Operator Training → Technical Support
3. Payment terms:
30% should be paid by T/T as down payment, the balance (70% of the total) should be paid by T/T or irrevocable L/C by payment (at sight) before delivery.
4. Delivery conditions:
4.1 D delivery conditions: FOB Qingdao port or CIF port of destination.
4.2 Delivery period: 30- _ _ _60 working days after receiving the advance payment, the seller should notify the buyer to inspect the goods, and the seller should complete the packaging of the goods and prepare for delivery within 15 working days after receiving the full payment.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now