PVC Pipe Application:
Water Supply Pipe&Drainage pipe&Sewage Pipe
Production Flow:
Material →Heating Cooling Mixer →Material Feeding →Conical Twin Screw Extruder →Extrusion Mould & calibrator → vacuum Calibration Cooling Tank → (Spray Cooling Tank) →Printer → Haul-off Unit →cutter →stacker
Equipment Features:
PVC Pipe Diameter Range:φ16mm-φ800mm
The Vacuum Calibration Tank will be equipped with different quantity and power of water pump and vacuum pump for different pipe diameter
For extruder Temperature Control system,Digital PLC control or Manual Temperature Control Meter
Caterpillar Haul-off unit with two caterpillar, threecaterpillar, four caterpillar,six caterpillar,eight caterpillar design for different range of pipe diameter haul-off
Guillotine cutter&Planetary cutter can be choosed according to different diameter pipe.
Equip with special mould and other device,it can produce inner wall sprial pipe and Inner wall hollow pipe and three layer pipe.
Easy Operation,Reliable performance,High Extrusion Efficiency,Easy Maintenance
Main parameter of pvc pipe plastic machine
technical parameter:
model |
65/132 |
Extruding capacity |
180-200kg/h |
Specifications |
75-200(mm) |
thickness |
0.8-4mm |
Motor power |
37kw |
Screw diameter |
65mm |
common problem :
1. Why choose
We We are Qingdao Zhongrui Plastic Machinery Co., Ltd. Machine quality and customer satisfaction are our pursuits. I believe we have the strength to provide you with high-quality machines and perfect services.
2. What services do we provide?
Pre-sale communication → design plan, signature confirmation →
Customized production → test machine before shipment → packaging
Shipment → Engineer Installation → Operator Training → Technical Support
3. Payment terms:
30% should be paid by T/T as down payment, the balance (70% of the total) should be paid by T/T or irrevocable L/C by payment (at sight) before delivery.
4. Delivery conditions:
4.1 D delivery conditions: FOB Qingdao port or CIF port of destination.
4.2 Delivery period: 30- _ _ _60 working days after receiving the advance payment, the seller should notify the buyer to inspect the goods, and the seller should complete the packaging of the goods and prepare for delivery within 15 working days after receiving the full payment.